Getting into it-AA Report- Day 64
Something to note before I get into it
Days late (did I really not write a report in June?), I apologize to the co-directors Matthew and Shinobu for making them wonder if I was still in this! I wrote to them yesterday to assure them that yes, I am indeed still in this! Time does seem to be passing by rather quickly though. It reminds me of when I was a child and school would let out for the summer, summer always flew by and here we are now already in July! I’ll start my second report by giving a brief update on June.
June
A lot happened and I can honestly say that I’ve been writing in my head for the entire month but for some reason not writing things down- the words are mostly lost now. It seemed easier, I guess, to just work through everything without taking the time to sit down and write. It’s funny because I found myself speaking to a lot of people about how wonderful the writing aspect of this residency is; that it enables the residents to be creative in other ways. Writing is something that I’ve always enjoyed but I don’t spend much time doing, with the exception of writing some poetry (here and there) and an artist statement, bio etc. I’ll be watching myself more carefully this month, making sure I take the time to physically write. It’s a fantastic way to process thoughts. I believe I have a whole chapter in my head right now about how I’ve been negotiating being an artist on hiatus while working in an art gallery, so look for a report about this in the future! June also presented me with the obstacle of how to find a place within the artworld as an artist on hiatus while not comprising my hiatus status. More about this later too.
Yesterday
Yesterday I went with my mom to pick up a building permit (it cost $100). I didn’t know that this would be a requirement to do work on the house. The house is owned by my family so why would we have to pay the town to renovate it? It turns out that that’s the law. Watch for it- there might also be a report coming about bureaucracy. 😉
The building permit covers the right to build as well as the right to demolish (take down). We’ll be taking down a balcony and another part of the house where the fire was and building around that. The balcony this summer, the other part I’m not sure when, time is limited. Interior work will be done as well.
Yesterday my partner, mother and I also spent time clearing away wild grape vines that have overgrown, growing over and around the house, suffocating the clothesline and a telephone wire. The removal of brush from around the house is integral to the prep work; before doing anything to the exterior brush must first be cleared away. I’ll be focusing on this for the next little while as well as figuring out how to bring a large balcony down! (see photos for more)
Closing notes
Reading other residents reports has made me recognize how much of my own project is tied into memory/history, and so I would really appreciate some direction from the co-directors (readers too) about whether they would like me to write more about this.
Until next time!
(Getting into it- A(rt) A(nonymous) Report-Day 64)
Covered Clothesline How do we approach these?
The grapevine attached itself by tendrils that seemed to mimic the wire of the clothesline
Getting a closer look at how the porch is attached